Rocket


Overview
Financials
News + Filings
Key Docs
Charts
Ownership





All
All (ex-4s)
10-K
10-Q
8-K
3,4,5
Proxy
Prospectus
Other



Integra Resources Corp. (ITR) Create: Alert

All | News | Filings
Date FiledTypeDescription
08/24/2023 SC 13G Equinox Partners Investment Management LLC reports a 6.8% stake in Integra Resources Corp.
08/24/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA REPORTS FINAL OXIDE DRILL RESULTS AND KEY OBSERVATIONS FROM STOCKPILE DRILL PROGRAM AT DELAMAR Vancouver, British Columbia - Integra Resources Corp. is pleased to announce the remaining drill results from the stockpile drill program at the DeLamar Project located in southwestern Idaho. The stockpile drill program was completed in Q2 2023 and totaled 12,588 meters in 321 drill holes. This news release includes results from the remaining 145 drill holes representing 4,244 m. The stockpile drill program at DeLamar was designed to test a large portion of the estimated 60 million tonnes of gold and silver mineralized material that was stockpiled and/or used as backfill at the Project by previous operators. The Company believes that oxide-and-mixed gold and silver mineralized material f..."
08/14/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Management's Discussion and Analysis of Integra Resources Corp. for the six-month periods ended June 30, 2023 and 2022",
"Unaudited Interim Condensed Consolidated Financial Statements of Integra Resources Corp. for the six-month period ended June 30, 2023 and 2022",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CEO",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CFO",
"Consent of Timothy Arnold",
"Consent of Raphael Dutaut"
08/14/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Report entitled "NI 43-101 Technical Report Preliminary Economic Assessment for the Wildcat and Mountain View Projects, Pershing and Washoe Counties, Nevada, United States of America" dated July 30, 2023, with an effective date of June 28, 2023",
"INTEGRA FILES MAIDEN PRELIMINARY ECONOMIC ASSESSMENT TECHNICAL REPORT FOR WILDCAT & MOUNTAIN VIEW PROJECTS Vancouver, British Columbia - Integra Resources Corp. is pleased to announce the filing of an independent Preliminary Economic Assessment technical report for the Wildcat Project and Mountain View Project located in western Nevada. The PEA demonstrates the potential for a low-cost, high-margin, heap leach gold-silver operation with a phased development and production strategy and robust economics. The average annual production of Wildcat & Mountain View and the DeLamar Project on a combined basis is expected to exceed 200kozs of gold equivalent , demonstrating one of the largest heap leach production profiles among precious metal developers in the Great Basin. Wildcat & Mountain Vie..."
07/26/2023 6-K Quarterly results
07/12/2023 6-K Quarterly results
07/07/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Material Change Report"
06/30/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"VOTING RESULTS FOR THE ANNUAL GENERAL MEETING OF SHAREHOLDERS",
"Report of Voting Results"
06/08/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA ANNOUNCES ADDITIONAL OXIDE DRILL RESULTS FROM STOCKPILE DRILL PROGRAM AT"
06/01/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Material Change Report"
05/26/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA COMPLETES SHARE CONSOLIDATION",
"Letter of Transmittal"
05/23/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA ANNOUNCES ADDITIONAL OXIDE DRILL RESULTS FROM STOCKPILE DRILLING PROGRAM AT"
05/19/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "Management Information Circular",
"Notice of Meeting",
"Management Information Circular",
"Form of Proxy"
05/16/2023 SC 13G/A Coeur Mining, Inc. reports a 0% stake in INTEGRA RESOURCES CORP.
05/12/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Management's Discussion and Analysis of Integra Resources Corp. for the three-month periods ended March 31, 2023 and 2022",
"Unaudited Interim Condensed Consolidated Financial Statements of Integra Resources Corp. for the three-month period ended March 31, 2023 and 2022",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CEO",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CFO",
"Consent of E. Max Baker",
"Consent of Timothy Arnold",
"Consent of Raphael Dutaut"
05/12/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Material Change Report",
"Investor Rights Agreement between Wheaton Precious Metals",
"Right of First Refusal Agreement between Wheaton Precious Metals International Ltd. and Integra Resources Corp",
"Supplemental Warrant Indenture between Integra Resources Corp., Millennial Precious Metals Corp. and TSX Trust Company"
05/10/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA PROVIDES CORPORATE UPDATE Vancouver, British Columbia - Integra Resources Corp. is pleased to provide an update on work programs and upcoming catalysts at its flagship assets located in the Great Basin, USA, as well a corporate update with respect to the proposed share consolidation. Integra is focused on achieving several key milestones in 2023, including an updated mineral resource estimate and the submission of the Mine Plan of Operations at the DeLamar Project located in southwestern Idaho, as well as an updated mineral resource estimate and Preliminary Economic Study at the Wildcat & Mountain View Projects, located in western Nevada. The Company is pleased to host a corporate update webinar on Tuesday, May 16, 2023 at 8:00am PST/11:00am EST. The webinar will feature a present..."
05/04/2023 6-K Quarterly results
04/19/2023 6-K Quarterly results
03/30/2023 6-K Quarterly results
03/17/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Material Change Report"
03/17/2023 20-F Form 20-F - Annual and transition report of foreign private issuers [Sections 13 or 15(d)]:
03/16/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA RESOURCES ANNOUNCES CLOSING OF C$35 MILLION FINANCING, INCLUDING STRATEGIC INVESTMENT FROM WHEATON PRECIOUS METALS"
03/14/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA ANNOUNCES OXIDE DRILL RESULTS: 0.59 g/t GOLD EQUIVALENT OVER 111 M AND 0.67 g/t GOLD EQUIVALENT OVER 50 M FROM DELAMAR STOCKPILE DRILL PROGRAM, 0.54 g/t GOLD EQUIVALENT OVER 55 M IN FIRST FLORIDA MOUNTAIN BACKFILL DRILL RESULT Drill results from North DeLamar Backfill drill program include: NDM-22-039: 0.27 grams per tonne gold and 24.60 g/t silver ) over 111.25 meters NDM-22-038: 0.32 g/t Au and 20.79 g/t Ag over 53.34 m NDM-22-117: 0.34 g/t Au and 25.29 g/t Ag over 50.29 m NDM-22-146: 0.29 g/t Au and 18.72 g/t Ag over 102.11 m First drill results from Florida Mountain's Jacobs Gulch Backfill include: JG-23-021: 0.61 g/t Au and 9.02 g/t Ag over 19.81 m JG-23-056: 0.51 g/t Au and 11.72 g/t Ag over 41.15 m Including 7.47 g/t Au and 12.18 g/t Ag over 1.53 m JG-23-087: 0.48 g/t Au and..."
03/08/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Material Change Report",
"Arrangement Agreement between Integra Resources Corp and Millennial Precious Metals Corp",
"Voting Support Agreement",
"First Supplemental Credit Agreement between Integra Resources Corp and Beedie Investments Ltd"
02/27/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA RESOURCES AND MILLENNIAL PRECIOUS METALS ANNOUNCE FRIENDLY AT-MARKET MERGER AND STRATEGIC INVESTMENT FROM WHEATON PRECIOUS METALS",
"INTEGRA RESOURCES AND MILLENNIAL PRECIOUS METALS ANNOUNCE EQUITY FINANCINGS OF C$35 MILLION"
01/31/2023 SC 13G/A FRANKLIN RESOURCES INC reports a 7.2% stake in INTEGRA RESOURCES CORP.
01/10/2023 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA ANNOUNCES OXIDE DRILL RESULTS: 0.52 g/t GOLD EQUIVALENT OVER 102 M AND 0.97 g/t GOLD EQUIVALENT OVER 24 M FROM DELAMAR STOCKPILE DRILL PROGRAM, 1.38 g/t GOLD EQUIVALENT OVER 67 M IN METALLURGICAL DRILLING Drill results from DeLamar stockpile drill program include: NDM-22-037: 0.25 grams per tonne gold and 21.38 g/t silver ) over 102.11 m NDM-22-040: 0.34 g/t Au and 18.19 g/t Ag over 83.82 m NDM-22-050: 0.28 g/t Au and 53.26 g/t Ag over 24.38 m NDM-22-136: 0.32 g/t Au and 14.28 g/t Ag over 85.34 m NDM-22-147A: 0.32 g/t Au and 19.60 g/t Ag over 42.68 m NDM-22-143: 0.23 g/t Au and 19.25 g/t Ag over 67.06 m The Company also announces drill results from metallurgical drill holes at DeLamar, including: IDM-22-211: 0.41 g/t Au and 75.37 g/t Ag over 66.90 m Including 0.38 g/t Au and 1,251...."
12/19/2022 6-K Quarterly results
12/07/2022 6-K Quarterly results
11/14/2022 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"Management's Discussion and Analysis of Integra Resources Corp. for the nine-month periods ended September 30, 2022 and 2021",
"Unaudited Interim Condensed Consolidated Financial Statements of Integra Resources Corp. for the nine-month periods ended September 30, 2022 and 2021",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CEO",
"Certification of Interim Filings Full Certificate of Integra Resources Corp. in connection with the filing of the interim financial report and interim MD&A by CFO",
"Consent of E. Max Baker",
"Consent of Timothy Arnold"
10/20/2022 6-K Quarterly results
10/13/2022 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA PROVIDES UPDATE ON PROJECT PERMITTING AT DELAMAR GOLD-SILVER PROJECT,"
09/12/2022 6-K Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]:
Docs: "FORM 6-K",
"INTEGRA ANNOUNCES 11,000 M DRILL PROGRAM ON 60 MILLION TONNES OF LOW-GRADE GOLD-SILVER MINERALIZED STOCKPILES FROM PREVIOUS OPERATORS, POTENTIAL TO INCREASE MINE LIFE AND EXPAND PRODUCTION Integra's exploration team has identified approximately 60 million tonnes of low-grade gold-silver mineralized material that was stockpiled and/or used as backfill by previous mine operators at DeLamar from the 1970s to the late 1990s. Based on historic mining, milling and drill data, Integra is confident that the bulk of this material is oxidized or partially oxidized and that the grade of most of this material should be sufficient to warrant processing as part of the heap leach operation. Previous operators at the DeLamar Project processed material through a mill with an average grade of 1.2 g/t gold a..."
  Next >>

Rocket Data Systems, Inc. © 2019 | Contact Us | Data Disclaimer | Terms of Use | Privacy